Our Infrastructure

  • blog post with image

    Our melting shop comprises of 2 latest Electro therm medium frequency induction furnaces, from which the metal is supplied. The specifications of the Furnaces are:

    Read more
  • blog post with image

    A semiautomatic sand plant for treatment of green sand to be used for mould production.

    Read more
  • blog post with image

    To decrease the impact on the environment, the latest sand technology is used in the moulding system as well as using some of the former skills on the specialist casting projects up to 500 kg depending on the type of metal.

    Read more
  • blog post with image
  • blog post with image

    All the materials /mould boxes are handled with help of overhead electric operating cranes to ensure safety of the employees at the workplace.

    Read more
  • blog post with image

    After the metal is poured in the mould box, and the casting is ready to be taken out from the mould box, the knockout system helps in removing the sand from the casting.

    Read more